image
    • image English
    • image Español
    qr Code Url

    Escanee qrcode para ver el sitio web móvil

    Los datos están vacíos
    0
    Centro de miembros
    Salir

    Solicitar Cotización Gratuita

    Inicio /Blog /Vídeo de visita a la fábrica /From Order to Delivery: Shenzhen LED Factory Production Process /

    From Order to Delivery: Shenzhen LED Factory Production Process

    Stella Zhao | 2026-04-25
    {当前产品的产品关键词轮巡使用}

    As a Shenzhen-based LED luminaire manufacturer with UL, CE, RoHS, ISO 9001:2015 certifications, Lumin has served over 600 B2B clients and accumulated more than 20 years of export experience.
    We fully understand that behind every custom or bulk order lies your dual expectation of quality and lead time.

    That‘s why we openly present the entire journey — from order confirmation to final shipment — including why we set a reasonable lead time of 15 to 30 working days for custom LED products.


    1. After Order Confirmation: Internal Production Order Released Immediately

    Upon order confirmation and deposit payment, we generate an internal production order in our ERP system within 1 working day.

    This order is simultaneously sent to the production supervisor, procurement, and warehouse teams for a synchronized workflow.


    2. Material Check & Procurement Scheduling (Key Factor Affecting Lead Time)

    The production supervisor immediately accesses real-time inventory data to verify:

    • Core materials: housings, aluminum PCBs, LED chips, drivers, wires, screw kits, etc.

    • Auxiliary materials: thermal paste, waterproof gaskets, cartons, etc.

    If materials are sufficient → move directly to production scheduling
    If materials are insufficient → procurement issues rush orders to our long-term suppliers, typically taking 3–7 working days for delivery

    Fast-Track for Standard Products:

    • Standard products in stock: direct quality inspection and fast shipment

    • Out of stock but small quantity or spare line capacity: delivery in 7–10 working days

    Shenzhen Lumin LED lamp materials inventory warehouse  LED container truck loading Shenzhen lumin factory

    Custom Material Notification Mechanism:

    If your order involves custom materials (special CCT, wattage, size, or mold-opening parts), we will send you a written notice within 2 working days listing the procurement list and estimated arrival time.
    Should any supplier delay occur, we will proactively explain the reason and offer two solutions:
    ① Slightly extend the lead time while locking the original price
    ② Use equivalent alternative brand materials (subject to your email confirmation)
    We never leave our clients waiting in the dark.

    This is one of the main reasons why custom orders require a longer lead time (30 working days).


    3. Production Scheduling & Management

    Once materials are ready, the production planner places your order into the production calendar according to current line loads. During peak seasons when multiple orders run in parallel, we clearly mark the “expected start date“ in the schedule.

    • Non-custom products (standard UL/CE models with stock or common materials): faster scheduling — total lead time approximately 10–15 working days

    • Custom products (special parameters, private molds, dedicated materials): longer scheduling wait — total lead time approximately 30 working days

    During high-volume periods, we use night shifts or weekend overtime to shorten waiting time, but never at the cost of reducing quality checks.


    4. Three Rounds of Quality Inspection: More Than Just ”Lighting Up“

    Quality is the lifeline of LED luminaires. Every batch must pass three inspection gates.

    4.1 In-Process Quality Control (IPQC)

    After key processes such as SMT, soldering, and driver assembly, our inspectors use integrating spheres, hipot testers, and power meters to check:

    • Electrical parameters: power, power factor, current, voltage

    • Insulation & hipot: meet CE/UL safety standards

    • Optical pre-test: luminous flux, CCT, color rendering index (Ra / R9)

    Any anomaly found is immediately returned for rework — no defective unit moves to the next step.

    Shenzhen Lumin LED factory production monitoring camera Shenzhen Lumin LED PCB SMT assembly line
    4.2 24‑Hour Full‑Load Burn‑In Test

    After final assembly, all luminaires are forced into the burn-in room for a continuous 24‑hour burn-in test (extendable to 24–48 hours for special requirements).

    • Burn-in conditions: rated voltage, 25±5°C ambient, spacing ≥20cm between units

    • Monitoring: dead LEDs, lumen depreciation, flickering, driver temperature rise, housing discoloration/leakage

    • Failure criteria: power deviation >10% or goes out midway → automatically marked as failed

    The system records electrical parameters every hour. Failed units are reworked and re‑burned for another 24 hours.

    Shenzhen Lumin LED aging test process photo collage Lumin LED 24-hour burn-in test aging room
    4.3 Outgoing Quality Control (OQC)

    After burn-in, products are not packed directly. They undergo a final complete inspection including:

    • Appearance, screws, labels

    • Waterproof test (for outdoor luminaires: short immersion or spray)

    • Functional re-test (on/off, dimming, CCT switching)

    • Pre-packaging spot check per AQL standard

    If any unit fails → the entire batch is returned to the production line for root-cause analysis → re‑burn‑in → re‑OQC. We firmly adhere to ”No quality, no shipment.“


    5. Packing & Shipping Arrangement

    Products that pass OQC enter the packing area:

    • Anti‑static bags + EPE foam dividers + custom or export‑grade cartons

    • Labeling, palletizing, and stretch‑wrapping according to customer requirements

    Then our logistics partners (sea, air, courier) arrange shipment, and we provide packing lists and traceability documents together.

    LED lamp anti-static packaging EPE foam

    6. Lead Time Explanation & Commitment

    Product Type Standard Lead Time (working days) Applicable Scenario
    Non-custom 15 working days Standard models, materials in stock or common procurement
    Custom 30 working days Special parameters, private molds, dedicated materials, procurement needed

    6.1 Lead‑Time Start Rule:

    The above lead times are counted from the day after you confirm the order drawing, complete payment, and we notify you in writing that ”materials are ready“.

    6.2 Compensation for Late Delivery

    • Non-custom orders not shipped by the 16th working day → 0.5% of order value per working day (cap: 5%)

    • Custom orders not shipped by the 31st working day → same rule applies
      (Excludes force majeure or changes requested by you)

    6.3 Expedited Production Conditions (meet two of the following to request)

    ① Order quantity ≤ 200 pcs, and it is a non-custom model
    ② Agree to pay a rush fee (+15% of order value)
    ③ Accept non‑interruptive rush production (using evenings/weekends, without interrupting other clients’ schedules)

    Expedited lead time: Non-custom orders can be reduced to as fast as 3–7 working days, while still fully executing the 24‑hour burn‑in + OQC.


    7. We Are Not Afraid of You Looking Closely

    We never promise unrealistically short lead times, because quality is the foundation of long‑term cooperation.

    If you have any doubts about our production process or testing standards, you are welcome to:

    • Schedule a virtual or on‑site factory audit (Shenzhen factory)

    • Request sample testing (we can send samples for you to test first)

    Shenzhen LED manufacturer staff group photo
    Thank you for reading this detailed process. For more information, please contact your dedicated sales representative.

    Shenzhen Lumin Lighting Team — Let every light stand the test of time.

     

    Tour de la fábrica Lumin

    Related blog
    2025-12-08 |Lumin
    Tour de la fábrica Lumin

    ADDRESS

    3/F, Bldg 1, Baolu Technology Park Baoshi West Rd. Shiyan St. Bao'an Dist. Shenzhen, 518132.China

    CONTACT US

    Tel:+86 755 23316621 WA:+86 15875556677 Email:

    E:info@luminlight.com

    PRODUCTS
    • LED Linear Light

    • LED Panel Light

    • Artificial Skylight

    • LED Downlight

    • LED Ceiling Light

    • LED Track Light

    • All Products

    DOWNLOAD
    • Custom Lighting

    • Healthy Lighting

    • School & Office Lighting
      Hospital Lighting
      Retail Lighting

    • Industrial Lighting

    • Outdoor Lighting

    BLOG
    DOWNLOAD
    ABOUT US
    • FQAs

    • Warranty

    • ISO

    • Business License

    • Patents and IPR

    • Certificates

    • Downloads

    • Factory Tour Video

    • Lumin Brand Video

    SERVICES
    CERTIFICATION
    CONTACT US
    COMMUNICATION
    • About Us

    • Brand story

    • Blog

    • News

    Warranty period
    PROJECT PROTECTION
    ISO 9001 CERTIFICATION
    SOCIAL MEDIA:
    SiteMap

    © 2026 LuminLight | All Rights Reserved

    Email: info@luminlight.com

    (14052)